SBK relies on GRESSEL pyramids – greater efficiency in 5-axis machining

SBK relies on GRESSEL pyramids – greater efficiency in 5-axis machining

SBK relies on GRESSEL pyramids – greater efficiency in 5-axis machining

gre4doc 3-fold pyramid with C3
gre4doc 3-fold pyramid with C3

About SBK – Staudacher Brugger Kapitza

SBK GmbH, based in Schramberg-Sulgen, is an innovative manufacturing company with many years of experience in machining technology. With modern machinery and a dedicated team, SBK manufactures high-precision components for various industries. Its mission: top quality, on-time delivery and cost-effective manufacturing solutions.

Challenge: Short run times and high set-up costs

When machining on a Hermle C250 5-axis machine, SBK faced the challenge that frequent tool changes and short running times were limiting productivity. This led to unnecessary downtime and higher component costs – a clear starting point for optimisation.

gre4doc 3-fold pyramid with C3
gre4doc 3-fold pyramid with C3

The solution: GRESSEL pyramid clamping solution

Through our partner Ceratizit, SBK decided to use GRESSEL pyramid clamping systems in combination with a zero-point clamping system.

The pyramid solution enables multiple clamping in a small space and is ideal for 5-axis machining. The zero-point clamping system allows clamping devices to be changed quickly, significantly reducing set-up times.

The result: more parts, less time

The advantages for SBK are clearly measurable:

  • Over 30% shorter component cycle times thanks to reduced tool change times.
  • In the same time, three components are now being produced instead of two.
  • Lower manufacturing costs per part thanks to higher productivity.
  • Higher machine utilisation with consistent precision.
  • Less set-up time, as the zero-point clamping system speeds up changeovers.

Customer quote

“We are very satisfied with the solution. Thanks to GRESSEL pyramids, we have been able to significantly reduce running times and now produce three parts instead of two in the same amount of time. This not only makes us faster, but also more competitive.”
– Mr Lac, SBK GmbH

gre4doc 3-compartment pyramid on Hermle C250
gre4doc 3-compartment pyramid on Hermle C250

Conclusion: Partnership for greater efficiency

The collaboration between SBK, Ceratizit and GRESSEL demonstrates what successful partnerships in manufacturing look like: modern clamping technology, practical advice and concrete savings in production.

👉 Your production can also benefit from innovative clamping solutions. Contact us to find out more.

Beitrag teilen
LinkedIn
Facebook
WhatsApp
Email
[gtranslate]

Request designs

Get in touch with us.

GRESSEL AG | Schützenstrasse 25 | CH – 8355 Aadorf
P
+41 52 368 16 16 | E verkauf@gressel.ch

Contact form

Get in touch with us.

GRESSEL AG | Schützenstrasse 25 | CH – 8355 Aadorf
P
+41 52 368 16 16 | E verkauf@gressel.ch